Abstract
Objectives: To reduce time delays of Engineering Procurement Construction(EPC) projects in the oil and gas industry. Methods: This study used Business Process Re-engineering (BPR) methodology applied in project management. The methodology used starting Prepare for Engineering, Map and Analyze As-Is Process, Design To-Be Process, Re-engineered Process and Improve Continously. Findings:This study resulted an improved project planning using business process reengineering method with time on engineering phase is reduced up to 55% and the procurement phase with an efficiency up to 35%. Application/Improvements:BPR method should be used in evaluating the delay in project work
| Original language | English |
|---|---|
| Pages (from-to) | 1-8 |
| Journal | Indian Journal of Science and Technology |
| Volume | 11 |
| Issue number | 9 |
| DOIs | |
| Publication status | Published - Mar 2018 |
Keywords
- Business Process Re-engineering, Information System, Oil and Gas, Operation Management, Project Management
Fingerprint
Dive into the research topics of 'Business Process Re-Engineering of Engineering Procurement Construction (EPC) Project in Oil and Gas Industry in Indonesia'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver