TY - JOUR
T1 - Blockchain-based implementation of building information modeling information using hyperledger composer
AU - Suliyanti, Widya Nita
AU - Sari, Riri Fitri
N1 - Funding Information:
Funding: The authors thank the Ministry of Research and Higher Education of the Republic of Indonesia for financial support for this research under the PTUPT Grant number NKB-2955/UN2.RST/ HKP.05.00/2020.
Publisher Copyright:
© 2020 by the authors. Licensee MDPI, Basel, Switzerland.
Copyright:
Copyright 2021 Elsevier B.V., All rights reserved.
PY - 2021/1/1
Y1 - 2021/1/1
N2 - With the advancement of Building Information Modeling (BIM) technology, BIM gains more importance and becomes a prerequisite in building projects. BIM is useful throughout a building lifecycle; from building bid, design, construction, completion, operation, and maintenance to building demolition. However, current information exchange surrounding BIM is still limited and bound to a single participant or organization and is also limited to a particular phase in the building lifecycle. This paper aims to explore BIM information exchange among many parties involved in a secure manner using a blockchain platform throughout the whole building lifecycle. In this research, many parties involved in the building project will be able to recognize one another through deployment of a permissioned blockchain. This information exchange uses Hyperledger Composer, a permissioned blockchain running on a blockchain platform called Hyperledger Fabric. Our experiment shows that BIM information exchange could be further improved. In this study, BIM information exchange can be implemented not only in one building phase but throughout the whole building lifecycle. It also facilitates BIM information exchange among multiple participants in a secure manner via a permissioned blockchain.
AB - With the advancement of Building Information Modeling (BIM) technology, BIM gains more importance and becomes a prerequisite in building projects. BIM is useful throughout a building lifecycle; from building bid, design, construction, completion, operation, and maintenance to building demolition. However, current information exchange surrounding BIM is still limited and bound to a single participant or organization and is also limited to a particular phase in the building lifecycle. This paper aims to explore BIM information exchange among many parties involved in a secure manner using a blockchain platform throughout the whole building lifecycle. In this research, many parties involved in the building project will be able to recognize one another through deployment of a permissioned blockchain. This information exchange uses Hyperledger Composer, a permissioned blockchain running on a blockchain platform called Hyperledger Fabric. Our experiment shows that BIM information exchange could be further improved. In this study, BIM information exchange can be implemented not only in one building phase but throughout the whole building lifecycle. It also facilitates BIM information exchange among multiple participants in a secure manner via a permissioned blockchain.
KW - Bim
KW - Blockchain
KW - Building information modeling
KW - Hyperledger composer
KW - Permissioned blockchain
UR - http://www.scopus.com/inward/record.url?scp=85099011455&partnerID=8YFLogxK
U2 - 10.3390/su13010321
DO - 10.3390/su13010321
M3 - Article
AN - SCOPUS:85099011455
SN - 2071-1050
VL - 13
SP - 1
EP - 21
JO - Sustainability (Switzerland)
JF - Sustainability (Switzerland)
IS - 1
M1 - 321
ER -