TY - JOUR
T1 - Analysis of safety cost structure in infrastructure project of cable stayed bridge based on Work Breakdown Structure (WBS)
AU - Putra, A. S.P.
AU - Latief, Y.
N1 - Publisher Copyright:
© Published under licence by IOP Publishing Ltd.
PY - 2020/5/18
Y1 - 2020/5/18
N2 - The development of infrastructure in Indonesia is currently quite massive, in accordance with the Government of Indonesia's policy in accelerating infrastructure developments. However, along with the increase in the construction sector, work accidents in the construction sector also increased. Cable Stayed Bridge is one of the excellent technologies in connecting islands but has a high potensial hazards and risks and it can cause fatal accidents. Accidents can be prevented through a good occupational safety and health management system (OHSMS). The application of OHSMS financing in Indonesian construction sector, especially in the cable stayed bridge has not been clearly and measurably regulated. In its implementation, the existing regulations have not yet been fully followed by the construction actors. This study aims is to develop the safety cost based on Work Breakdown Structure (WBS). The research method are survey research and descriptive analysis. The study results are the cable stayed bridge standardized WBS, potential hazard sources, the preventive action to each potential hazards in each activity, finding the safety cost components based on WBS and the calculation of safety cost percentage in order to improve the OHSMS quality and reducing work accidents in the cable stayed bridge projects.
AB - The development of infrastructure in Indonesia is currently quite massive, in accordance with the Government of Indonesia's policy in accelerating infrastructure developments. However, along with the increase in the construction sector, work accidents in the construction sector also increased. Cable Stayed Bridge is one of the excellent technologies in connecting islands but has a high potensial hazards and risks and it can cause fatal accidents. Accidents can be prevented through a good occupational safety and health management system (OHSMS). The application of OHSMS financing in Indonesian construction sector, especially in the cable stayed bridge has not been clearly and measurably regulated. In its implementation, the existing regulations have not yet been fully followed by the construction actors. This study aims is to develop the safety cost based on Work Breakdown Structure (WBS). The research method are survey research and descriptive analysis. The study results are the cable stayed bridge standardized WBS, potential hazard sources, the preventive action to each potential hazards in each activity, finding the safety cost components based on WBS and the calculation of safety cost percentage in order to improve the OHSMS quality and reducing work accidents in the cable stayed bridge projects.
UR - http://www.scopus.com/inward/record.url?scp=85086244764&partnerID=8YFLogxK
U2 - 10.1088/1757-899X/830/2/022075
DO - 10.1088/1757-899X/830/2/022075
M3 - Conference article
AN - SCOPUS:85086244764
SN - 1757-8981
VL - 830
JO - IOP Conference Series: Materials Science and Engineering
JF - IOP Conference Series: Materials Science and Engineering
IS - 2
M1 - 022075
T2 - 3rd International Conference on Innovation in Engineering and Vocational Education 2019, ICIEVE 2019
Y2 - 26 November 2019
ER -