TY - JOUR
T1 - ANALISIS KARAKTERISTIK PERJALANAN PRIMER TRUK ANGKUTAN BARANG DI JAKARTA Studi Kasus : Terminal Angkutan Barang Pulo Gebang dan Tanah Merdeka
AU - Riyadi, Afief
AU - Nahry,
AU - Burhan, Helen
PY - 2015
Y1 - 2015
N2 - This study is aimed to analyze the characteristic of primary trip (point to point) of freight trucks in Tanjung Priok area, particularly the ones who use Tanah Merdeka Freight Terminal and Pulo Gebang Freight terminal as their transit point. The analysis is intended to get the overview of truck productivity, and then use it for further improvement on city logistic system. Trip productivity is related to the activities of moving and stay. Hence, trip productivity is described by the speed indicator to represent the trucks on moving, and time indicator to represent the stay condition. The Travel Diary Survey shows that the portion of idle time is bigger than the one of movement time (52.15% and 52.21% are idle times for Pulo Gebang and Tanah Merdeka, respectively), where the biggest portion of the idle time occurred at the industry and factoy area for loading unloading acitivities. Improvement can be made by improving the scheduling system of load /unload in factory/industry and port area, and reducing the congestion. They are expected to reduce the truck cycle time up to 19.80% per trip.
AB - This study is aimed to analyze the characteristic of primary trip (point to point) of freight trucks in Tanjung Priok area, particularly the ones who use Tanah Merdeka Freight Terminal and Pulo Gebang Freight terminal as their transit point. The analysis is intended to get the overview of truck productivity, and then use it for further improvement on city logistic system. Trip productivity is related to the activities of moving and stay. Hence, trip productivity is described by the speed indicator to represent the trucks on moving, and time indicator to represent the stay condition. The Travel Diary Survey shows that the portion of idle time is bigger than the one of movement time (52.15% and 52.21% are idle times for Pulo Gebang and Tanah Merdeka, respectively), where the biggest portion of the idle time occurred at the industry and factoy area for loading unloading acitivities. Improvement can be made by improving the scheduling system of load /unload in factory/industry and port area, and reducing the congestion. They are expected to reduce the truck cycle time up to 19.80% per trip.
UR - https://journal.unnes.ac.id/nju/index.php/jtsp/article/view/6904
U2 - 10.15294/jtsp.v17i2.6904
DO - 10.15294/jtsp.v17i2.6904
M3 - Article
VL - 21
JO - Jurnal Teknik Sipil dan Perencanaan
JF - Jurnal Teknik Sipil dan Perencanaan
SN - 2503-1899
IS - 1
ER -