A NOVEL ROUGH FUZZY BASED DELPHI METHOD FOR HIGHWAY PROJECTS RISK ANALYSIS: THE SOE ASSIGNMENT SCHEME CASE STUDY

Gilang Ardi Pratama, Yusuf Latief, Lukas Beladi Sihombing

Research output: Contribution to journalArticlepeer-review

1 Citation (Scopus)

Abstract

In accelerating the development of the area in Sumatra, the Indonesia Government assigned to PT. X to manage toll-road concessions on 24 Sumatra toll roads. PT X is an enterprise with full ownership by the government. Sumatra toll-road development is economically but not financially viable; therefore, this scheme was implemented to avoid abuse of authority and legal uncertainty issues from government administrators. The Indonesian government named it the "State-Owned Enterprise (SOE) Assignment Scheme," but this project has several technical and non-technical problems. The technical problems are material, geotechnical Condition, equipment, and others. The non-technical problems are policy, financial, and others. These problems may impact the time and cost of the Sumatran toll-road development. This study aims to list the risks and evaluate each factor corresponding to the Sumatran toll-road development based on the Rough Fuzzy Based Delphi Method. Questionnaires have been collected from seven experts. There are 12 critical risk factors in this study that will impact the project. The proposed method can reduce the level of uncertainty and subjectivity that exists in the process of risk identification and analysis. The results of this study will increase our understanding of the impact of each criterion, which can be valuable for future studies on toll-road projects with the SOE assignment scheme.

Original languageEnglish
Pages (from-to)110-117
Number of pages8
JournalInternational Journal of GEOMATE
Volume23
Issue number100
DOIs
Publication statusPublished - 2022

Keywords

  • Delphi
  • Fuzzy
  • Risk
  • Rough numbers
  • State-owned enterprise

Fingerprint

Dive into the research topics of 'A NOVEL ROUGH FUZZY BASED DELPHI METHOD FOR HIGHWAY PROJECTS RISK ANALYSIS: THE SOE ASSIGNMENT SCHEME CASE STUDY'. Together they form a unique fingerprint.

Cite this