Keyphrases
Bangka Island
25%
Bored pile
25%
BPJS Ketenagakerjaan
25%
Building Construction Projects
50%
Construction Method
25%
Contingency Cost
25%
Cost Contingency
25%
Critical Risk Factors
25%
Foundation Work
25%
Gas pipeline
25%
Gas Plant
25%
Heavy Lifting
25%
High-rise Construction
25%
Hybrid Power Plant
25%
Indonesia
100%
Jakarta
30%
Joint Operation
25%
Lifting Construction
25%
Maintenance Cost
25%
Maturity Model
25%
New Renewable Energy
25%
Office Building
25%
Operation Cost
25%
Organizational Policy
25%
Organizational Values
25%
Procurement Organisation
25%
Procurement Performance
25%
Procurement Policy
25%
Quantitative Risk
25%
Risk Assessment
25%
Risk Factor Assessment
25%
Risk Factors
44%
Risk Modeling
25%
Risk Response
30%
Risk-based Approach
50%
Road Development
25%
Roof Truss
25%
Schedule Delay
25%
Schedule Management
25%
Schedule Performance
31%
Secant pile
25%
Space Frame
25%
Stadium
25%
Strand Jack
25%
Strategy Development
37%
Supply Chain Performance
25%
Time Performance
50%
Toll Road
37%
Toll Road Project
50%
Work Activity
25%
Engineering
Access Road
12%
Building Construction
50%
Cable Installation
8%
Collect Data
25%
Construction Method
25%
Correlation Test
25%
Critical Path
16%
Day Value
8%
Deep Foundation
25%
Electric Power Plant
25%
Empty Fruit Bunch
9%
Energy Mix
12%
Feasibility Study
25%
Gas Pipeline
25%
Gas Processing
25%
Graphical Result
8%
Histogram
8%
Hybrid Power
25%
Improvement Strategies
25%
Installed Capacity
9%
Joints (Structural Components)
25%
Levelized Cost of Energy
15%
Lifecycle
15%
Lifecycle Cost
9%
Main Stage
8%
Negative Impact
12%
Office Buildings
25%
Operation and Maintenance
25%
Operation and Maintenance Cost
25%
Pearsons Linear Correlation Coefficient
25%
Performance Improvement
12%
Project Life Cycle
10%
Project Schedule
21%
Project Team
8%
Quantitative Approach
25%
Renewable Energy
22%
Residual Risk
8%
Rise Building
25%
Risk Identification
25%
Risk Model
25%
Road Construction
8%
Roof Truss
25%
Schedule Delay
25%
Space Frame Truss
8%
Space Segment
8%
Specialist Contractor
12%
Stadiums
25%
Strand
25%
Surveyor
12%
Toll Highways
25%