Keyphrases
Indonesia
100%
Jakarta
27%
Rigid Plastic
25%
Repair Data
25%
Key Process Area
25%
Maintenance Scheduling
25%
Driving Quality
25%
Debulking Surgery
25%
Vehicle Driving
25%
Vehicle Quality
25%
Partial Least Squares Structural Equation Modeling (PLS-SEM)
25%
Conservation Development
25%
User Satisfaction
25%
Design Criteria
25%
Oil Gas Industry
25%
Testing Laboratory
25%
E-wallet
25%
System Improvement
25%
Plastic Packaging
25%
Material Value Conservation
25%
Factor Analysis
25%
Ride-hailing Drivers
25%
Eco-friendly City
25%
Advanced Ovarian Cancer
25%
Riding Experience
25%
Motorcycle Riding
25%
Green Transportation
25%
Sustainability Efficiency
25%
Ovarian Cancer Patients
25%
Failure Data
25%
Single-center Experience
25%
Overall Survival
25%
Cooling Tower
25%
Stakeholder Action
25%
Transport Electrification
25%
Industry Transition
25%
Excited State Intramolecular Proton Transfer (ESIPT)
25%
Photoswitches
25%
Isomer-specific
25%
Hemithioindigo
25%
Solvation Structure
25%
Long-range Dispersion
25%
Donor-acceptor Stenhouse Adducts
25%
Failure Prediction Model
25%
Polarizable Force Field
25%
Multiple Resonance
25%
Motion pictures
25%
Switching Path
25%
Subdomain IB
25%
Allostery
25%
Engineering
Rigid Plastic
25%
Design Display
25%
Collecting Data
25%
Process Area
25%
Product Quality
25%
Customer Satisfaction
25%
Least Square
25%
Design Criterion
25%
Gas Oil
25%
Energy Conservation
25%
Economic Benefit
25%
Maintenance Planning
25%
Service Factor
25%
Energy Efficiency
25%
Environmentally Sustainable Transport
25%
Key Process
25%
Solar Energy
25%
Measured Result
25%
Gap Value
25%
Systems Performance
25%
Responsiveness
25%
Machine Learning Algorithm
25%
Gas Pipeline
25%
Motion Picture
25%
Excited State
25%
Random Forest
16%
Ground State
16%
Maintainability
15%
Excitation Energy
12%
Molecular Mechanics
12%
Electrostatic Force
12%
Catastrophic Event
8%
Natural Gas Pipeline
8%
Natural Gas
8%
Data Preprocessing
8%
Begin Process
8%
Performance Testing
8%
Failure Data
8%
Accurate Prediction
8%
Transmissions
8%
Pareto Chart
5%
Pump Performance
5%
Repair Time
5%
Maintenance Personnel
5%
Redundant Unit
5%
Event Time
5%
Performance Improvement
5%
Failure Event
5%
Series System
5%
Plastic Recycling
5%