Keyphrases
Indonesia
100%
Conceptual Model
44%
Indonesian
38%
System Dynamics Model
29%
System Dynamics Approach
24%
Risk Impact
22%
Maritime Logistics
21%
Electric Vehicle
20%
Human Resources
19%
Impact Analysis
19%
Container Terminal
19%
Port Cluster
19%
Policy Analysis
19%
Partial Least Squares Structural Equation Modeling (PLS-SEM)
19%
Cargo
16%
Discrete Event Simulation
13%
Demand Uncertainty
12%
Performance-based
12%
Shipping Routes
12%
Nusantara
12%
Employee Turnover
12%
Policy Effectiveness
11%
Simulation Approach
11%
Logistics Cost
11%
System Dynamics
10%
Cluster Development
10%
Indonesia Government
10%
Commander
9%
Rice Supply Chain
9%
Lead Time Demand
9%
Long Lead Time
9%
Rooftop Photovoltaic
9%
Demand-Driven MRP
9%
Effective Production
9%
Program Impact
9%
Photovoltaic Adoption
9%
Maritime Cluster
9%
Strategy Evaluation
9%
Bamboo Biomass
9%
Safety Leadership
9%
Insurance Program
9%
Financial Strategy
9%
Loss Ratio
9%
Economic Model
9%
Cattle Insurance
9%
Innovation Systems
9%
Multi-actor Systems
9%
Dispatching Problem
9%
Industry Innovation
9%
Open-pit Mine
9%
Engineering
Systems Dynamics
37%
Electric Vehicle
20%
Logistics Cost
19%
Logistics Network
19%
Discrete Event Simulation
16%
Simulation Model
14%
Logistics System
14%
Battery (Electrochemical Energy Engineering)
13%
Net Present Value
12%
Infrastructure
12%
Dynamic Models
10%
Design Model
9%
System Program
9%
Electric Network Analysis
9%
Lead Time
9%
Operating Cost
9%
Power Engineering
9%
Techno-Economic Assessment
9%
Internal Rate of Return
9%
Renewable Energy
9%
Payback Period
9%
Sustainability Assessment
9%
Energy Engineering
9%
Consumer Product
9%
Agent-Based Modeling
9%
Systems Analysis
9%
Airfield
9%
Life Cycle Analysis
9%
Environmental Impact
9%
Solar Energy
9%
System Development
9%
Decision Analysis
9%
Cargo Barge
9%
Photovoltaics
9%
Main Product
9%
Shale Gas
9%
Relative Distance
9%
Manufacturing Company
9%
Production Planning
9%
Enhanced Oil Recovery
9%
Process Output
9%
Virtual Reality
9%
Similarities
9%
Ergonomic Design
9%
Packaging Material
9%
Consumer Behavior
9%
Ideal Solution
9%
Water Supply Systems
9%
Inventory Level
7%
Power Generation
6%