Projects per year
- 300 - 350 out of 7,187 results
Search results
-
Integrating Ecosystem Services to The Conservation Planning in Cidanau Watershed, Banten
20/04/20 → 31/12/21
Project: Research
-
Effect of Basicity on The Selective Reduction Process of Low-Grade Limonitic Nickel Ore
20/04/20 → 31/12/21
Project: Research
-
Design of multi-resonant and multi-tuned microstrip RFcoil for ultra high field MRI applications
20/04/20 → 31/12/21
Project: Research
-
Dialog Material dan Tektonik :Transformasi Praktik Desain Berbasis Konteks
20/04/20 → 31/12/21
Project: Research
-
Strategi Pemeliharaan Preventif Perkerasan Jalan Berbasis User Cost
20/04/20 → 31/12/21
Project: Research
-
Pemodelan Risiko Bencana pada Perencanaan Kawasan Industri
Dwi Nowo, M.
20/04/20 → 31/12/21
Project: Research
-
The Role of Artificial Intelligence in Lung Tuberculosis Prediction using Chest X-ray and Clinical Data (RAIT Study)
Yusuf, P. A.
20/04/20 → 31/12/21
Project: Research
-
Kepribadian dan Perilaku Caring: Hubungannya dengan Kinerja Perawat
Kuntarti
20/04/20 → 31/12/21
Project: Research
-
Penilaian Kerugian Ekonomi dan Jasa Lingkungan Berbasis Ekosistem di Kawasan Pesisir Banten
Mizuno, K.
20/04/20 → 31/12/21
Project: Research
-
Pengaruh Metode Pembelajaran Menggunakan Simulasi Virtual Reality untuk Mahasiswa Keperawatan: Pengetahuan, Sikap, dan Keterampilan (Motivasi) Mahasiswa
Rahman, L. O. A.
20/04/20 → 31/12/21
Project: Research
-
Investigasi Pengaruh Fasa MgZn2 Presipitat ZnZr terhadap Mekanisme dan Perilaku Korosi Paduan Magnesium ZK61 sebagai Implan Biomedik
Zakiyuddin, A.
20/04/20 → 31/12/21
Project: Research
-
-
Indifference Curve Ketahanan Ekonomi Rumah Tangga Konsumen dalam Perspektif Ekonomi Pancasila di Indonesia
20/04/20 → 31/12/21
Project: Research
-
Kebijakan Pelestarian dan Pengembangan Industri Seni Kriya Logam Desa Tumang, Boyolali
19/07/21 → 31/12/21
Project: Research
-
Pengembangan Produk Lokal Berupa Implan Craniomaxillofacial Interlocking Jigsaw Puzzle Sistem 2.0 Berbasis Logam Titanium untuk Tata Laksana Fraktur Mandibula sebagai Penunjang Kemandirian Alat Kesehatan Nasional
Hardjakusumah, C. L. D. S.
20/04/20 → 31/12/21
Project: Research
-
Penanganan Pandemi Covid-19 dari Perspektif Hukum Sosial dan Budaya; Perspektif Interdisiplin
19/07/21 → 31/12/21
Project: Research
-
Village Fund for Peatlands Restoration: Study of Community’s Perceived Challenges and Opportunities in Muaro Jambi Regency
Mizuno, K.
20/04/20 → 31/12/21
Project: Research
-
Pola dan Perilaku Penumpang Commuter Line dalam Penggunaan Moda Transportasi On Line
20/04/20 → 31/12/21
Project: Research
-
Program Mengoptimalkan Peran Ibu dalam Membangun Minat Baca pada Anak Usia Dini dalam Situasi Pandemi
Mursitolaksmi, L. R., Suharso, P. L., Patricia, Prasetyawati, W., Novianti, A. & Nasrida, V.
1/06/21 → 31/12/21
Project: Community Engagement
-
Identifikasi Diagnostik Biomarker Angiogenesis dengan Teknik Sample Swab Pada Luka Kaki Diabetes
20/04/20 → 31/12/21
Project: Research
-
Intervensi dan Faktor-Faktor yang Mengontrol Perilaku Self-Management pada Pasien Diabetes Melitus Tipe 2
20/04/20 → 31/12/21
Project: Research
-
Kebutuhan Informasi Pasien Ginekologi dan Kemampuan Perawat dalam Memberikan Edukasi Kesehatan Ginekologi
20/04/20 → 31/12/21
Project: Research
-
-
Pengembangan Metode Deteksi Prekursor Gunung Api Dengan Menggunakan Data Penginderaan Jauh Optis dan SAR
20/04/20 → 31/12/21
Project: Research
-
-
-
Strategic Entrepreneurship Paradox in Pre-venturing Process: An empirical evidence of Asian Startups.
20/04/20 → 31/12/21
Project: Research
-
Penggunaan Big Data dalam Penentuan Rute Angkutan Perkotaan di Awal dan Akhir Perjalanan
20/04/20 → 31/12/21
Project: Research
-
Triangle antara Desentralisasi, Pertumbuhan Ekonomi dan Kelas Menengah
20/04/20 → 31/12/21
Project: Research
-
Optimasi Desain Struktur Pelat dengan Mempertimbangkan Jenis Material melalui Metode Up and Downgrade
20/04/20 → 31/12/21
Project: Research
-
Physical Identification of nDalem Pangeranan Banyumas Heritage Collections
20/04/20 → 31/12/21
Project: Research
-
Study of Interference Mitigation for 5G Massive Services
Gunawan, D. & Astharini, D.
20/04/20 → 31/12/21
Project: Research
-
Pembiayaan Risiko Bencana Sebagai Dampak Perubahan Iklim pada Sektor Pertanian (Studi Khasus pada Kawasan Pertanian di Kabupaten Sumedang)
Suyud
20/04/20 → 31/12/21
Project: Research
-
Investigasi Fasa yang Mempengaruhi Mekanisme dan Perilaku Korosi Paduan Magnesium AZ31B untuk Aplikasi Implan Biomedik
Zakiyuddin, A. & Anis, M.
20/04/20 → 31/12/21
Project: Research
-
Efektivitas Acceptance Commitment Group Therapy Berbasis Daring Terhadap Penanganan Insomnia Pada Dewasa Muda Selama Pandemi COVID-19 di Indonesia
Oriza, I. I. D., Astuti, A. D., Radyani, A. M. & Pramestuti, N. A.
1/08/21 → 31/12/21
Project: Community Engagement
-
Faktor-faktor yang Menyebabkan Kekerasan pada Remaja Hamil dan Efektivitas Intervensi Pencegahannya
20/04/20 → 31/12/21
Project: Research
-
Simulasi Aliran Heliks Spontan Material Aktif Nematik Pada Daerah Turbulensi Permukaan Silinder
20/04/20 → 31/12/21
Project: Research
-
Synthesis and Analysis of Mg-Doped PbTe-MTe (M = Ba, Ca, Sr) Thermoelectric Material
20/04/20 → 31/12/21
Project: Research
-
Analisis Faktor yang Mempengaruhi Manajemen Diri pada Pasien Penyakit Kronis
20/04/20 → 31/12/21
Project: Research