Projects per year
Projects
- 430 Finished
Search results
-
Finished
Aplikasi Pipa Kalor pada Sistem Manajemen Termal Motor Listrik dan Iradiator Gamma
Putra, N. S. D. (PI)
1/01/18 → 31/12/18
Project: Research
-
Pengembangan Oscillating Heat Pipe untuk Desain Heat Pipe Heat Exchanger pada Aplikasi Sistem Tata Udara
Putra, N. S. D. (PI)
1/01/18 → 31/12/18
Project: Research
-
Pengembangan Gasifikasi Biomassa tipe Fixed Bed Downdraft untuk Pembangkit Listrik Melalui Kontrol Proses Gasifikasi dengan Menggunakan Programmable Logic Control dan Internet of Things
Surjosatyo, A. (PI)
Ministry of Research, Technology and Higher Education of Republic of Indonesia
1/01/18 → 31/12/18
Project: Research
-
-
Model Perpindahan Panas dan Massa untuk Droplet
Kosasih, E. A. (PI)
Ministry of Research, Technology and Higher Education of Republic of Indonesia
1/01/18 → 31/12/18
Project: Research
-
Naskah Akademis Rancangan Peraturan Daerah Energi dan Ketenagalistrikan
Alhamid, M. I. (PI)
31/03/17 → 29/09/17
Project: Community Engagement
-
Efisiensi Maksimum Turbin Pikohidro Untuk Elektrifikasi Daerah Terpencil: Studi Kasus Bengkulu
Budiarso (PI)
Ministry of Research, Technology and Higher Education of Republic of Indonesia
1/01/17 → 31/12/18
Project: Research
-
Pengembangan Heat Pump Dengan Solar Thermal Kolektor Menggunakan Refrigeran Yang Ramah Lingkungan
Alhamid, M. I. (PI)
Ministry of Research, Technology and Higher Education of the Republic of Indonesia, Ministry of Research, Technology and Higher Education of Republic of Indonesia
1/01/17 → 31/12/18
Project: Research
-
Kontrol Aktif Separasi Aliran dengan Aktuator Plasma untuk Drag Reduction
Budiarso (PI)
Ministry of Research, Technology and Higher Education of Republic of Indonesia
1/01/17 → 31/12/18
Project: Research
-
Design and Developing Lab-on-Chip PCR for Point of Care Testing Kit
Whulanza, Y. (PI)
Ministry of Research, Technology and Higher Education of Republic of Indonesia
1/01/17 → 31/12/17
Project: Research
-
"Optimasi Jarak dan Bentuk Lambung Kapal Katamaran untuk Mendapatkan Stabilitas Baik pada Kapal Hisap Timah di Kepulauan Bangka Belitung"
Yanuar (PI)
2/05/15 → 31/12/15
Project: Community Engagement