Projects per year
Projects
- 430 Finished
- 250 - 300 out of 430 results
Search results
-
Finished
-
Pengembangan Gasifikasi Biomassa tipe Fixed Bed Downdraft untuk Pembangkit Listrik Melalui Kontrol Proses Gasifikasi dengan Menggunakan Programmable Logic Control dan Internet of Things
Surjosatyo, A. (PI)
Ministry of Research, Technology and Higher Education of Republic of Indonesia
29/03/19 → 31/12/19
Project: Research
-
Pengembangan Sistem Rem Kendaraan Listrik Berukuran Besar
Budiono, H. D. S. (PI)
Ministry of Research, Technology and Higher Education of Republic of Indonesia
29/03/19 → 31/12/19
Project: Research
-
Model Perpindahan Panas dan Massa untuk Droplet
Kosasih, E. A. (PI)
Ministry of Research, Technology and Higher Education of Republic of Indonesia
29/03/19 → 31/12/19
Project: Research
-
Perancangan Charging System untuk Bus MOLINA
Sumarsono, R. D. A. (PI)
Ministry of Research, Technology and Higher Education of Republic of Indonesia
29/03/19 → 31/12/19
Project: Research
-
Investigasi Kedalaman Sudu Terhadap Efisiensi Turbin Piko Hidro Jenis Crossflow
Warjito (PI)
Ministry of Research, Technology and Higher Education of Republic of Indonesia
29/03/19 → 31/12/19
Project: Research
-
Sistem keselamatan pariwisata pendakian dengan passive RFID tracker
Saragih, A. S. (PI)
13/03/19 → 31/12/19
Project: Inovation
-
Fenomena Pembakaran Membara Gambut Tropis dan Upaya Pengendaliannya
Nugroho, Y. S. (PI)
11/03/19 → 31/12/19
Project: Research
-
Pengembangan Material Alami dan Material Maju untuk Konservasi Energi Dan Lingkungan
Nasruddin (PI)
11/03/19 → 31/12/19
Project: Research
-
Pengembangan Sarana Pembelajaran Sistem Proteksi Kebakaran Skala Laboratorium
Nugroho, Y. S. (PI)
11/03/19 → 31/12/19
Project: Research
-
Studi dan Pengembangan Teknologi Dirgantara guna Meningkatkan Keilmuan Akan Transportasi Udara Demi Kemajuan Bangsa
Nirbito, W. (PI)
11/03/19 → 31/12/19
Project: Research
-
Kontrol Aktif Aliran Berbasis Jet Sintetik dan Plasma Untuk Rekayasa Termal-Fluida
Harinaldi (PI)
11/03/19 → 31/12/19
Project: Research
-
Pengembangan Organic Rankine Cycle (ORC) sebagai Pembangkit Listrik dengan Solar Thermal Energy
Alhamid, M. I. (PI)
11/03/19 → 31/12/19
Project: Research
-
Penilaian Green Port di Pelabuhan Besar di Indonesia dan Teknologi Peningkatan Efisiensi Lambung Kapal
Budiyanto, M. A. (PI)
11/03/19 → 31/12/19
Project: Research
-
Pengembangan Model Turbulen untuk Aplikasi Prediksi Dinamika Aliran Multifasa pada Turbin Crossflow
Siswantara, A. I. (PI)
11/03/19 → 31/12/19
Project: Research
-
Perancangan Ruangan Psychrometric untuk Pengujian Kinerja Sistem Tata Udara
Ardiyansyah (PI)
11/03/19 → 31/12/19
Project: Research
-
Pengukuran Konsumsi Energi Pada Peti Kemas Berpendingin (Refrigerated Container)
Budiyanto, M. A. (PI)
11/03/19 → 31/12/19
Project: Research
-
Resirkulasi Air Pendingin Kondensor Turbin Uap untuk Mengatasi Masalah Lingkungan dan Menghasilkan Akuades dari Air Laut
Kosasih, E. A. (PI)
11/03/19 → 31/12/19
Project: Research
-
Pengembangan Proses Micro-Milling untuk Proses Manufaktur Micro-Blanking Dies pada Produksi Alat Kesehatan Berukuran Mikro
Kiswanto, G. (PI)
11/03/19 → 31/12/19
Project: Research
-
PENGEMBANGAN TEKNOLOGI PHASE CHANGE MATERIAL DAN HEAT PIPE SEBAGAI SISTEM PENDINGIN PASIF
Putra, N. S. D. (PI)
11/03/19 → 31/12/19
Project: Research
-
DESAIN DAN TEKNOLOGI MANUFAKTUR TERHADAP MATERIAL BIODEGRADABEL SERTA MODIFIKASI PERMUKAAN UNTUK APLIKASI ALAT KESEHATAN
Supriadi, S. (PI)
11/03/19 → 31/12/19
Project: Research
-
Karakteristik Fluida Newtonian dan non-Newtonian Pada Aliran Dalam dan Aliran Luar
Yanuar (PI)
11/03/19 → 31/12/19
Project: Research
-
Pengaruh Rasio Wire Feeder pada Pengelasan Tungsten Inert Gas (TIG) pada Plat Aluminium AA 1100 dan AA 6063
Baskoro, A. S. (PI)
11/03/19 → 31/12/19
Project: Research
-
Investigation of Heat Transfer and Pressure Drop Using Characteristic of Flow Pattern on Evaporative Processes in Microchannels
Pamitran, A. S. (PI)
11/03/19 → 31/12/19
Project: Research
-
Pengembangan Steering System untuk Peningkatan Efisiensi Energi Kendaraan Listrik Molina MEV-02 Urban A
Sumarsono, R. D. A. (PI)
11/03/19 → 31/12/19
Project: Research
-
Potensi Nanopartikel Aluminium Oxide (Al2O3) pada Oli Refrigeran (R600a) terhadap Kinerja Sistem Refrigerasi Kompresi Uap Lemari Pendingin
Alhamid, M. I. (PI)
11/03/19 → 31/12/19
Project: Research
-
Penelitian Eksperimental R290 sebagai Subtitusi Drop-in unt R410A di Peralatan Tata Udara
Alhamid, M. I. (PI)
11/03/19 → 31/12/19
Project: Research
-
Penomena Aliran Pendingin Primer Reaktor Serba Guna - G.A. Siwabessy (RSG-GAS), Badan Tenaga Nuklir Nasional (BATAN), Serpong
Warjito (PI)
11/03/19 → 31/12/19
Project: Research
-
Studi Karakteristik Sistem Lokomotor (Syaraf-Otot-Tulang) Menggunakan Gait Analysis dan Uji Biomolekuler
Whulanza, Y. (PI)
11/03/19 → 31/12/19
Project: Research
-
Uji Terowongan Angin dan Material Komposit Kendaraan Terbang
Adhitya, M. (PI)
11/03/19 → 31/12/19
Project: Research
-
Diversifikasi Sumber Daya Alam Indonesia untuk Konservarsi Energi dan Lingkungan
Nasruddin (PI)
11/03/19 → 31/12/19
Project: Research
-
Pemanfaatan Low Grade Bioethanol dan Aditif Oxygenated untuk Menurunkan COV dan Emisi Gas Buang pada Motor Makara
Sugiarto, B. (PI)
11/03/19 → 31/12/19
Project: Research
-
Pengujian Aplikasi Ozone sebagai Metode Water Treatment pada Cooling Tower
Alhamid, M. I. (PI)
11/03/19 → 31/12/19
Project: Research
-
Investigasi Medan Aliran pada Turbin Crossflow Skala Piko untuk Aplikasi CFD
Budiarso (PI)
11/03/19 → 31/12/19
Project: Research
-
Eksperimental dan Numerical Analisis Fluida Newtonian dan Non-Newtonian
Yanuar (PI)
11/03/19 → 31/12/19
Project: Research
-
Pemanfaatan Dehumidifier dan Heat Recovery Condenser untuk Pengeringan Bahan Sensitif Panas Menggunakan Metode Spray Drying
Kosasih, E. A. (PI)
11/03/19 → 31/12/19
Project: Research
-
Pengembangan Electric Tilting Tricycle Purwarupa II dengan Konfigurasi Motor Mid-Drive
Sumarsono, R. D. A. (PI)
11/03/19 → 31/12/19
Project: Research