Projects per year
Projects
- 256 Finished
- 150 - 200 out of 256 results
Search results
-
Kajian Eksperimental Bekisting Berbahan Dasar Woven Polyethylene untuk Struktur Bawah Konstruksi Bangunan
Sjah, J. (PI)
20/04/20 → 30/09/21
Project: Research
-
Keberlanjutan Sungai Pesanggrahan Dalam Kemandirian Pelayanan Air Minum Dki Jakarta Berbasis Zonasi Air Baku
Hartono, D. M. (PI)
20/04/20 → 31/12/21
Project: Research
-
Analisis Implementasi Sistem Pemanfaatan Air Hujan Di Kota Bekasi
Mursidik, S. S. (PI)
20/04/20 → 30/09/21
Project: Research
-
Modelling of Traffic Accident Rates by Traffic Composition and Road Geoemtry on Inter-Urban Roads with Heterogenous Traffic
Tjahjono, T. (PI)
20/04/20 → 31/12/21
Project: Research
-
Strategi Intervensi Vulnerability Wilayah Hulu Sungai Citarum untuk Keberlanjutan Fungsi Ekosistem Sungai
Mursidik, S. S. (PI)
20/04/20 → 30/09/21
Project: Research
-
Pengembangan Model Perkiraan Kecelakaan pada Jalan antar Kota
Tjahjono, T. (PI)
20/04/20 → 31/12/21
Project: Research
-
Aplikasi Elemen Cangkang Triangular Pada Struktur Komposit Functionally Graded Materials (FGMs)
Katili, I. (PI)
20/04/20 → 31/12/21
Project: Research
-
Evaluasi Tegangan Residu pada Baja Profil C Canai Dingin Produksi Lokal
Purnomo, H. (PI)
20/04/20 → 31/12/20
Project: Research
-
Development of Indonesia Readiness Indicators in Transit Oriented Development
Sumabrata, R. J. (PI)
20/04/20 → 30/09/21
Project: Research
-
Determinant Severity Level of Pedestrian Accidents in Three Cities in Central Java Province in Indonesia
Tjahjono, T. (PI)
20/04/20 → 31/12/20
Project: Research
-
Kajian Potensi Pemanenan Air Hujan sebagai Sumber Penyediaan Air Baku Alternatif
Suwartha, N. (PI)
20/04/20 → 30/09/21
Project: Research
-
Kajian Isu Lingkungan Signifikan Pembangkit Listrik Termal dengan Life Cycle Assessment
Mursidik, S. S. (PI)
20/04/20 → 30/09/21
Project: Research
-
Kajian Perubahan Kualitas Air Danau Mahoni Universitas Indonesia Akibat Tutupan Permukaan Air dan Proses Aerasi
Suwartha, N. (PI)
20/04/20 → 31/12/20
Project: Research
-
Pengembangan Proses Perencanaan dan Pengendalian Proyek
Latief, Y. (PI)
20/04/20 → 30/09/21
Project: Research
-
Pengelolaan Kualitas Air pada Sumber Air Permukaan Kampus Universitas Indonesia Depok
Pratama, M. A. (PI)
20/04/20 → 30/09/21
Project: Research
-
Studi Karakteristik Kecepatan berdasarkan Kategori Kendaraan pada Jalan Antar-Kota
Siregar, M. L. (PI)
20/04/20 → 30/09/21
Project: Research
-
Kajian Manajemen Risiko Lingkungan Fasilitas Pengelolaan Limbah B3
Mursidik, S. S. (PI)
20/04/20 → 30/09/21
Project: Research
-
Structural Equation Model untuk Estimasi Biaya K3
Latief, Y. (PI)
20/04/20 → 30/09/21
Project: Research
-
Penggunaan Big Data dalam Penentuan Rute Angkutan Perkotaan di Awal dan Akhir Perjalanan
Kusuma, A. (PI)
20/04/20 → 31/12/21
Project: Research
-
Evaluasi Kinerja Sistem Operasi dan Pemeliharaan Infrastruktur Air Berbantuan Model Perangkat Lunak Mutakhir
Sutjiningsih, D. (PI)
20/04/20 → 30/09/21
Project: Research
-
Biaya Eksternal Perjalanan Last Mile Delivery dari Online Shopping
Nahry (PI)
20/04/20 → 30/09/21
Project: Research
-
Effect of Asphalt Content of Reclaimed Asphalt Pavement (RAP)
Sumabrata, R. J. (PI)
20/04/20 → 30/09/21
Project: Research
-
Studi Perilaku Pondasi Tiang Pancang Spun Pile yang tersambung ke Pile-Cap terhadap Pembebanan Lateral
Orientilize, M. (PI)
20/04/20 → 30/09/21
Project: Research
-
Penilaian Kesehatan DAS Berdasarkan Dinamika Lanskap
Sutjiningsih, D. (PI) & Marko, K. (PI)
20/04/20 → 31/12/21
Project: Research
-
Peningkatan Kinerja Waktu Proyek Pembangunan Infrastruktur Jalan Tol Trans- Sumatera Melalui Penerapan Metode Lean Construction (Improving Project Time Performance for Trans-Sumatera Toll Road Project Development using Lean Construction)
Berawi, M. A. (PI), Gunawan, G. (PI), Majid, F. R. S. (PI), Baezal, M. A. B. (PI) & Chairunisa, Z. (PI)
20/04/20 → 31/12/21
Project: Research
-
Strategi Meningkatkan Kualitas Fire Safety Protection pada Bangunan Gedung Bertingkat di Jakarta
Latief, Y. (PI)
20/04/20 → 31/12/21
Project: Research
-
Paradoks Pemenuhan Akses Air Minum bagi Masyarakat Berpenghasilan Rendah pada Kawasan Kumuh Perkotaan
Hartono, D. M. (PI)
20/04/20 → 31/12/21
Project: Research
-
Analysis of Preferences on Transportation Infrastructure and Service Users
Tjahjono, T. (PI)
20/04/20 → 30/09/21
Project: Research
-
Strategi Meningkatkan Maturity Level Budaya Mutu pada Perusahaan Jasa Konstruksi
Latief, Y. (PI)
20/04/20 → 31/12/21
Project: Research
-
Pemodelan Fenomena Pergerakan Lateral Akibat Likuifaksi Menggunakan MetodeSmoothed Particle Hydrodynamics
Soepandji., B. S. (PI)
20/04/20 → 31/12/21
Project: Research
-
Kemampuan Degradasi dari Jenis Plastik PE, PP, dan PET yang Terpapar Sinar UV pada Badan Air dengan Parameter Acuan BOD dan COD
Andari, G. S. B. (PI)
20/04/20 → 30/09/21
Project: Research
-
Model System Dynamic Pengembangan Tata Kelola Kualitas Air Sungai Berbasis Manajemen Risiko
Hartono, D. M. (PI)
20/04/20 → 31/12/21
Project: Research
-
Model Asesmen Struktur Fondasi untuk Kenaikan Seismic Demand Bangunan Gedung di Jabodetabek
Prakoso, W. A. (PI)
20/04/20 → 31/12/21
Project: Research
-
Nodal Based dan Elemen Based Smoothing pada Pelat FGMs dengan Menggunakan Elemen DSG
Katili, I. (PI)
20/04/20 → 30/09/21
Project: Research
-
Analisis Jejak Karbon di Empat Perkampungan Kumuh Kota
Andari, G. S. B. (PI)
20/04/20 → 30/09/21
Project: Research
-
Evaluasi Numerik Struktur Pelat Komposit FGMs dengan Menggunakan Elemen Triangular berbasiskan Teori Reissner-Mindlin
Maknun, I. J. (PI), Tjahjono, T. (PI) & Kusumastuti, R. (PI)
20/04/20 → 31/12/21
Project: Research